Service & quality is what we stand for

Service

Floor maintenance

After completion you will receive a maintenance advice from us to ensure that you can enjoy your floor for many years.

Coral door mat

One of the obvious advantages is to put a doormat at the entrance for cleaning shoes so the floor stays dry, clean and free from scratches.

Base offers coral doormats that are available in different colours, textures and designs. From neutral to more marked tones, with plain or mixed colours. But also doormats with a striped patterns or dark mats with coloured details. There is always a doormat that perfectly matches with your floor and personal preferences.

More information »

Floor protection

Choose for scratch no more
Scratch no more manufactures high quality floor protection materials that prevent any damages to your precious floor from scratches that come from moving chair- or table legs. It has complete floor protection systems for practically every type of furniture. Be careful with your floor and choose for protectors that work brilliantly!

Get discount here on all prices by using the link underneath:
https://baseinterieur.scratchnomore.nl

Subfloors, levelling and smoothing

Our flooring solutions can be applied to practically all subfloors with stability and a decent structure. Good preparation is essential for trouble-free installation. Before installation the subfloor must be clean, dry and free from any dirt.

The final result of the floor is highly dependent on the subfloor preparation. Any irregularities in the subfloor must be suitably prepared, which might involve levelling, sanding or polishing. It goes without saying that we will first check your subfloor and provide you with professional advice.

Most common sub floor

Sand-cement concrete screed:
This subfloor must be levelled and smoothened and needs approximately 4 weeks to completely dry out and harden. A rule of thumb exists which states that 1 centimetre of thickness means waiting 1 one week, so 4cm means 4 weeks, 5 cm 5 weeks and so on. Take into account that the temperature should be around 15 degrees. The moisture content of the surface may have a maximum of 2.5%.

Anhydrite screed:
This subfloor must be levelled and smoothened and needs approximately 4 weeks to completely dry out and harden. However, the moisture content with this surface may not exceed 0.5%. Anhydrite screeds have gypsum content which is why this screed must be equipped with a so called primer. In addition, the screed must be sanded too.

Tile/stone screed:
Tiles or natural stones that are firmly attached to the subfloor do not always have to be removed. The tiles will need to be pre-treated with an appropriate primer. After this process the surface may need to be levelled (depends on the screed; not necessary with gravel, marble stone or trowel floors).

Wooden substrate:
Our flooring solutions can also be installed on wooden substrates if a correct preparation technique is applied. To ensure a long-lasting application, the wooden floor needs to be flat and bonded properly. Ask for the available instructions to carry this out.

Warranty

NOA – Building warranty

Base Flooring- and Wall solutions is registered with NOA, the Dutch Association for Construction firms (Nederlandse Ondernemersvereniging voor Afbouwbedrijven). The insurer, NOA, is committed to maintaining a high quality standard in the sector. Thanks to their efforts a NOA registered company can offer assurance and warranty to its consumers.

NOA

Warranty from a NOA registered company

NOA associated firms make clear agreements in advance, no ambiguities or “hidden disclaimers”. NOA registered firms are experts in the field you can rely on. Yet, we want to offer two additional warranties:

  • NOA constructions firms guarantee a perfect final result
  • NOA vouch for a proper settlement in the case of a dispute

These warranties ensure that you can leave a renovation or construction without worries to an experienced and skilled professional.

Information & regulations